We have received word that the redundant street side generator has been connected, and a load transfer test will be performed tonight. Wednesday, November 7, 2012 from 8:00pm ET to 12:00am ET.
If this load transfer is successful, we will have 2 confirmed working power sources on site, and will be able to install a redundant fuel filter in our main generator tomorrow, further bolstering our resiliency.
We do not anticipate any impact from the Nor’easter blizzard/storm that is currently descending upon New York (though we certainly aren’t thrilled by it!)